CAF Oaris

From Wikipedia, the free encyclopedia
Jump to: navigation, search
CAF Oaris
Oaris de CAF (105.001) en proves per Vilafant (27209271713).jpg
Manufacturer CAF
Constructed 2010 (Prototype), 2015 (Production model)[1]
Entered service 2015
Operator(s) Renfe (as of 2015), Flytoget (2018)
Line(s) served AVE Network
Car body construction Aluminium
Train length 8-car set, 202.24 m (663 ft 6 in)[2]
Car length End car, 26,780 mm (87 ft 10 in)
middle cars, 24,780 mm (81 ft 4 in)[3]
Width (?)
Height (?)
Floor height 1,260 mm (4 ft 2 in)
Platform height (?)
Doors 4 and 8 per car
Maximum speed Design speed,
350 km/h (220 mph)
Service speed,
320 km/h (200 mph)
Weight (?)
Power output 660 kW (890 hp) per motor, 5,280 kW (7,080 hp) per 4-car set,
7,920 kW (10,620 hp) per 6-car set,
10,560 kW (14,160 hp) per 8-car set
Power supply Overhead catenary
Electric system(s) 25 kV 50 Hz AC, 15 kV 16.7 Hz,
3 kV DC, 1.5 kV DC
Current collection method Pantograph
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge,
1,668 mm (5 ft 5 2132 in) (Iberian gauge),
variable gauge

Oaris is a modular high-speed train platform developed by the Spanish manufacturer CAF.[4]

Technical details[edit]

Oaris is a non-articulated electric multiple unit with distributed traction, enabling 4-car, 6-car and 8-car configurations.[4] Each car have one powered bogie, with electric motors on both wheelsets, and one unpowered bogie.[5] Power equipment is designed to enable adaptation to all four of the main overhead electrification systems in use across Europe. For the train, running gear with 1,435 mm (4 ft 8 12 in) (standard gauge), 1,668 mm (5 ft 5 2132 in) (Iberian gauge) and variable gauge options has been developed.[5]

Oaris bodyshells was manufactured from aluminium,[4] the driving end cars have 26,780 mm (87 ft 10 in) long, middle cars 24,780 mm (81 ft 4 in) long, an 8-car set is 202.24 m (663 ft 6 in) long.

The train is fitted with 660 kW (890 hp) motors, giving a total power of 5,280 kW (7,080 hp) in the 4-car, 7,920 kW (10,620 hp) in the 6-car, and 10,560 kW (14,160 hp) in the 8-car configuration. Design speed is 350 km/h (220 mph), the service top speed is 320 km/h (200 mph).


  • May 2010. After fours years of development in a project supported by CDTI, CAF announced the Oaris platform with the unveiling of a full-scale mock-up in May 2010 in the International Rail Forum 2010 at Valencia.[4]
  • September 2010. A prototype starts to be assembled by CAF,[6] it has 4 cars and is designed for 216 seats. Renfe has reserved the class 105 for the prototype.[5]
  • January 14, 2011. CAF announces that the prototype is finished and will undergo dynamic tests in early 2011.[7]
  • December 2011. Four-car prototype undergoes trials at up to 352 km/h on the Madrid to Sevilla route.[5]
  • Spring 2013. Prototype gets homologation by Brazilian Railindustry Association, which will allow CAF to offer trains for the proposed high-speed rail connection between Rio de Janeiro and São Paulo.[8]
  • 2013. Test runs for homologation in Spain; in October 2013 company sources said the approval process of Oaris is in the final stages and within months is ready for operation.[9]
  • March 2015: The Norwegian airport train operator Flytoget ordrered eight 4-car trainsets (maximum speed 250 km/h) to supply their 16 trains fleet on their Drammen-Oslo-Gardermoen Airport service.[10][11] They will be known as Class 78.[12]

See also[edit]


External links[edit]