30 Stockton is a trolleybus line operated by the San Francisco Municipal Railway. The line is notable for being the slowest trolleybus route in the city of San Francisco because it travels through the
A New Flyer XT60 trolleybus at Stockton and Sacramento Streets in June 2024
A 30 bus (lower right) headed north after emerging from the Stockton Street Tunnel in 2009. A 1 California trolleybus passes by on Sacramento Street.
The Central Subway is a Muni Metro light rail tunnel in San Francisco, California, United States. It runs between Chinatown station in Chinatown and a portal in South of Market, with intermediate stop
A test train at Union Square/Market Street in November 2022
Rep. Nancy Pelosi, Mayor Ed Lee, and other dignitaries next to a poster-sized reproduction of the FTA Grant near Union Square (May 11, 2013)
TBM "Mom Chung" prepares for launch, May 2013
Track extension construction at 4th & King (September 5–8, 2015) as a part of the Central Subway Project