The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
CRRC Nanjing Puzhen rakes of the Mumbai Metro Blue Line on Chakala (J. B. Nagar)
CRRC Nanjing Puzhen rakes of the Mumbai Metro Blue Line on Chakala (J. B. Nagar)
Azad Nagar station under construction in Andheri in March 2012
Azad Nagar station under construction in Andheri in March 2012
A metro train arriving at the D.N. Nagar station during the trial run in May 2013
A metro train arriving at the D.N. Nagar station during the trial run in May 2013
Marol Naka station under construction in Andheri in 2012
Marol Naka station under construction in Andheri in 2012
Mumbai Metro at Gundavali Station
Mumbai Metro at Gundavali Station
Metro passes were included with the Mumbai 1 card introduced in 2021
Metro passes were included with the Mumbai 1 card introduced in 2021
A Blue Line CRRC Puzhen trainset approaching Andheri station in 2019
A Blue Line CRRC Puzhen trainset approaching Andheri station in 2019