The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Escalators in Bras Basah station underneath the reflective pool, which is a key feature of the station.
Escalators in Bras Basah station underneath the reflective pool, which is a key feature of the station.
Exit A of Bras Basah station
Exit A of Bras Basah station
The station platforms at 35 metres (115 ft) below ground
The station platforms at 35 metres (115 ft) below ground
Alstom Metropolis C851E trainset at HarbourFront station
Alstom Metropolis C851E trainset at HarbourFront station
Construction site of Bishan station in May 2006
Construction site of Bishan station in May 2006
Haw Par Villa under construction in December 2008
Haw Par Villa under construction in December 2008
Construction site of Cantonment in 2020
Construction site of Cantonment in 2020