The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
A Caltrain KISS electric trainset in revenue service in August 2024
A Caltrain KISS electric trainset in revenue service in August 2024
Commuter rail service along the San Francisco Peninsula had been using diesel locomotives (EMD F40PH pictured above) since the early 1950s; they were
Commuter rail service along the San Francisco Peninsula had been using diesel locomotives (EMD F40PH pictured above) since the early 1950s; they were replaced with electric train sets in the 2020s.
EMD AEM-7 electric locomotive, part of the equipment proposed in the 1992 Feasibility Study to electrify Caltrain. This AEM-7 is in revenue service wi
EMD AEM-7 electric locomotive, part of the equipment proposed in the 1992 Feasibility Study to electrify Caltrain. This AEM-7 is in revenue service with SEPTA.
The southbound platform of the Atherton station. The town of Atherton has backed litigation against Caltrain's electrification plans.
The southbound platform of the Atherton station. The town of Atherton has backed litigation against Caltrain's electrification plans.
San Joaquin River Viaduct under construction in 2019.
San Joaquin River Viaduct under construction in 2019.
The same viaduct completed in February 2021.
The same viaduct completed in February 2021.
The Fresno River Viaduct, part of the IOS, under construction, 2016.
The Fresno River Viaduct, part of the IOS, under construction, 2016.
The same location, 2017.
The same location, 2017.