The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Remaining trackbed of the Central Australia Railway near Lake Eyre South after the rails were lifted in 1981. Much of the 1241 km (771 mi) railway was
Remaining trackbed of the Central Australia Railway near Lake Eyre South after the rails were lifted in 1981. Much of the 1241 km (771 mi) railway was laid on bare earth without ballast.
A Commonwealth Railways poster of the 1940s advertising train travel to winter holidays in Central Australia. The scene is Heavitree Gap, or Ntaripe i
A Commonwealth Railways poster of the 1940s advertising train travel to winter holidays in Central Australia. The scene is Heavitree Gap, or Ntaripe in the Arrernte language, 3.5 km (2 mi) south of Alice Springs railway station. Both the size of the cliff and the speed of the train bore no connection with reality.
Work on the final section leading into Alice Springs, 1929
Work on the final section leading into Alice Springs, 1929
Work on the final section, where is connected to the Shell Depot in Alice Springs, 1929
Work on the final section, where is connected to the Shell Depot in Alice Springs, 1929
A preserved narrow-gauge bogie open wagon next to the rebuilt goods platform at Farina in 2021
A preserved narrow-gauge bogie open wagon next to the rebuilt goods platform at Farina in 2021