The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Columbia Area Transit
The transit center's west side. The center has bus stops on both the east and west sides of the MAX station.
The transit center's west side. The center has bus stops on both the east and west sides of the MAX station.
A Red Line train on the curved bridge south of the station. Until 2024, this single-track bridge built in 2001 was used by trains operating in both di
A Red Line train on the curved bridge south of the station. Until 2024, this single-track bridge built in 2001 was used by trains operating in both directions.
View of the transit center from its parking garage. The brick buildings in the foreground house a MAX traction substation and a break room for TriMet
View of the transit center from its parking garage. The brick buildings in the foreground house a MAX traction substation and a break room for TriMet bus drivers.
The Gateway North station on the day of opening, in 2024
The Gateway North station on the day of opening, in 2024