advertisement
Infinite photos and videos for every Wiki article · Find something interesting to watch in seconds
History
Page
Country Hills Boulevard and Beddington Trail intersecting in the lower part of the photo
Country Hills Boulevard and Beddington Trail intersecting in the lower part of the photo
Page
Looking west on Stoney Trail NE at its interchange with Deerfoot Trail
Looking west on Stoney Trail NE at its interchange with Deerfoot Trail
Northbound Deerfoot Trail curving at Memorial Drive and the Northeast Line of the CTrain. The interchange was constructed as part of the second Deerfo
Northbound Deerfoot Trail curving at Memorial Drive and the Northeast Line of the CTrain. The interchange was constructed as part of the second Deerfoot segment that opened in 1975, and the CTrain bridges were constructed in 2000.
Partial cloverleaf interchange at 17 Avenue SE in south Calgary
Partial cloverleaf interchange at 17 Avenue SE in south Calgary
The ramp from westbound Peigan Trail to southbound Deerfoot Trail was modified in 2009 to loop back upon itself, allowing for a greater merge distance
The ramp from westbound Peigan Trail to southbound Deerfoot Trail was modified in 2009 to loop back upon itself, allowing for a greater merge distance before crossing Ogden Road and the Bow River