Cross Bay Veterans Memorial Bridge
…equivalent to $388 million in 2024). It consisted of a widened version of the previous drawbridge, and a grade-separated interchange complex feeding into Beach Channel Drive and the Cross Bay Parkway. The Cross Bay Parkway was extended south along Beach 94th Street and Beach 95th Street to the Shore Front Parkway along…