The Downtown Line is a rail line on the Singapore Mass Rapid Transit system. Operated by SBS Transit, the line runs from Bukit Panjang station in the north-west of the country towards Expo station in
A C951 train at Stevens station
Construction site of Rochor in August 2014, which involved the diversion of the Rochor Canal
The temporary viaduct built at Cross Street for the construction of Telok Ayer in December 2010
The construction of DTL tunnels between Chinatown and Fort Canning. The project was considered an engineering feat, as the construction of the tunnels involved the diversion of the Singapore River.
The Circle Line is a rail line on the Singapore Mass Rapid Transit system. Operated by SMRT trains, it runs in a loop mostly within the Central Region of the country, with a spur running from Dhoby Gh
Downtown Line
…initially conceived as three separate projects – the Bukit Timah Line, the northern half of the Eastern Region Line, and the Downtown Extension of the Circle Line. These projects were merged into the DTL in 2007, and construction began in three stages. Stage 1, which spans from Bugis to Chinatown, opened in 2013…
Alstom Metropolis C851E trainset at HarbourFront station
Construction site of Bishan station in May 2006
Haw Par Villa under construction in December 2008
Construction site of Cantonment in 2020