The East Coast Integrated Depot is an integrated bus and train depot located in the Xilin subzone of Tampines, Singapore. It currently serves the East–West Line of the Mass Rapid Transit system, with
Construction site of the East Coast Integrated Depot in January 2024
Model of the East Coast Integrated Depot
Sengkang LRT Line Mitsubishi Heavy Industries Crystal Mover C810 11 @ Cheng Lim 2025 02 02
The Kawasaki Heavy Industries & CRRC Qingdao Sifang C151C is a class of trains that are the sixth generation electric multiple unit rolling stock in operation on the existing North–South and East–West
C151C train approaching Bukit Batok station
Interior of a C151C train.
Builder's plate of a C151C train