GOES 12
…was then stored until it was needed to replace an operational satellite. It served as an on-orbit spare until 2003, when it was called up to replace GOES-8, an older satellite which, while still operational, would have run out of fuel by the end of the year. Although GOES-11 was the next backup in line for…