The Gateway Program is an ongoing expansion and renovation of the Northeast Corridor rail line between Newark, New Jersey, and New York City along the right-of-way between Newark Penn Station and New
Construction of a future Gateway Program tunnel portal at West Side Yard in Manhattan in 2014
New York Tunnel Extension, 1912
Site of the western portal of the tunnel in North Bergen at Tonnelle Avenue
NEC passes through Harrison Station.
The 7 Subway Extension is a subway extension of the New York City Subway's IRT Flushing Line, which is served by the 7 local and <7> express services. The extension stretches 1.5 miles southwest from
Overview of subway construction area with arrows pointing to the entrances. (Left arrow points to main 34th Street entrance; right arrow, secondary 35th Street entrance.)
Mayor Bloomberg at the 34th Street station on December 20, 2013
Digging the station cavern