HAL TEDBF
…first phase, two prototypes were to be built, based on the Tejas Mk. 1 design. In the second phase, two more prototypes were to be built based on the Tejas Mk. 2 design. The programme was jointly funded by the Defence Research and Development Organisation (DRDO) and the Indian Navy, with the latter funding 40…