Halkalı-Bahçeşehir Rail System
…railway station Bahçeşehir Stations 5 (Operational: 2, Out of Service: 1, Under construction: 2) Service Operator TCDD Transportation Rolling stock TCDD E32000 History Opened 23 May 2022 (Halkalı, Bahçeşehir) Technical Line length 1.35 km (0.84 mi) Electrification 25kV AC overhead line The B2 (Halkalı-Bahçeşehir…