Infinite photos and videos for every Wiki article · Find something interesting to watch in seconds
History
Page
Southern entrance
Southern entrance
Northern entrance to High Barnet Station
Northern entrance to High Barnet Station
A walkway around the end of the platform 1 track provides step-free access to platforms 2 and 3
A walkway around the end of the platform 1 track provides step-free access to platforms 2 and 3
Platforms 1 and 2 seen from the footbridge
Platforms 1 and 2 seen from the footbridge
Page
The nickname "Tube" comes from the circular tube-like tunnels through which the small profile trains travel. (Deep level Northern line London Undergro
The nickname "Tube" comes from the circular tube-like tunnels through which the small profile trains travel. (Deep level Northern line London Underground 1995 Stock train)
A sub-surface Metropolitan line train (S8 Stock) at Farringdon
A sub-surface Metropolitan line train (S8 Stock) at Farringdon
The Metropolitan Railway opened in 1863 using GWR broad-gauge locomotives.
The Metropolitan Railway opened in 1863 using GWR broad-gauge locomotives.
Passengers wait to board a tube train in 1906.
Passengers wait to board a tube train in 1906.