Infinite photos and videos for every Wiki article · Find something interesting to watch in seconds
Infinite photos and videos for every Wiki article · Find something interesting to watch in seconds
High Marnham Power Station Viewed from the east in July 2004
High Marnham Power Station Viewed from the east in July 2004
Cooling towers in June 2006
Cooling towers in June 2006
E.ON sign in February 2008
E.ON sign in February 2008
Demolition of chimneys on 15 December 2004
Demolition of chimneys on 15 December 2004
Thoresby Colliery Junction and signal box. Colliery trains turn left into the siding, while the double-track test track begins straight ahead
Thoresby Colliery Junction and signal box. Colliery trains turn left into the siding, while the double-track test track begins straight ahead
"Start of Staff Section" sign on the last signal post marking the start of the unsignalled test track main line.
"Start of Staff Section" sign on the last signal post marking the start of the unsignalled test track main line.
North limit of clearance on the Bevercotes Colliery Branch section of the test track in 2012, just north of Boughton Brake Tunnel
North limit of clearance on the Bevercotes Colliery Branch section of the test track in 2012, just north of Boughton Brake Tunnel