The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Bombardier Flexity Freedom unit #506 approaches Fairway Station
Bombardier Flexity Freedom unit #506 approaches Fairway Station
Willis Way station under construction in December 2015; both the embedded track and station platform have been poured
Willis Way station under construction in December 2015; both the embedded track and station platform have been poured
The system's Operations, Maintenance and Storage Facility (OMSF)
The system's Operations, Maintenance and Storage Facility (OMSF)
GRT Ion bus used on BRT service.
GRT Ion bus used on BRT service.
GRT's fleet consists of low-floor buses such as this Nova LFS, and Flexity Freedom light rail vehicles
GRT's fleet consists of low-floor buses such as this Nova LFS, and Flexity Freedom light rail vehicles
An older GRT bus on the 21 Elmira Route at Conestoga Station
An older GRT bus on the 21 Elmira Route at Conestoga Station
The first light-rail vehicle - a Bombardier Flexity Freedom - on public display in April 2017
The first light-rail vehicle - a Bombardier Flexity Freedom - on public display in April 2017
LRT vehicle in line testing in 2018
LRT vehicle in line testing in 2018