The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Kathryn P. Hire
Kathryn P. Hire
STS-130
Patrick during EVA 3, preparing the Cupola for operational use following its installation on the ISS
Patrick during EVA 3, preparing the Cupola for operational use following its installation on the ISS
Seated (l–r) Virts and Zamka. Standing (l–r) are Patrick, Behnken, Hire and Robinson.Space Shuttle program← STS-129STS-131 →
Seated (l–r) Virts and Zamka. Standing (l–r) are Patrick, Behnken, Hire and Robinson.Space Shuttle program← STS-129STS-131 →
Node 3 at its factory in Italy. The structural steel hull is visible.
Node 3 at its factory in Italy. The structural steel hull is visible.
Tranquility during its move from Endeavour to the install position on the Unity node.
Tranquility during its move from Endeavour to the install position on the Unity node.