The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Ken ham v 2
Ken ham v 2
STS-124
Kibō's pressurized module, two days after its installation, with Discovery in the background
Kibō's pressurized module, two days after its installation, with Discovery in the background
From left to right: Chamitoff, Fossum, Ham, Kelly, Nyberg, Garan and HoshideSpace Shuttle program← STS-123STS-126 →
From left to right: Chamitoff, Fossum, Ham, Kelly, Nyberg, Garan and HoshideSpace Shuttle program← STS-123STS-126 →
A crane moves Discovery toward the external tank and SRBs in high bay 3 of the Vehicle Assembly Building for STS-124.
A crane moves Discovery toward the external tank and SRBs in high bay 3 of the Vehicle Assembly Building for STS-124.
ISS configuration after the STS-124 Mission (1J) is completed.
ISS configuration after the STS-124 Mission (1J) is completed.