Kidwelly and Llanelly Canal
…where the new canal would cross the existing Ashburnham Canal. The newly formed company was required to complete the extension from Pwll y Llygod to Pontyates and the first section of the Llanelly branch to the point where it crossed the Ashburnham Canal within six years. Anthony Bower was the engineer, and…