The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Official photograph of No.37 shortly after delivery in 1905.
Official photograph of No.37 shortly after delivery in 1905.
Diagram showing leading dimensions
Diagram showing leading dimensions
No. 38 as running in 1907
No. 38 as running in 1907
Leader locomotive 36001 with test train at Oxted
Leader locomotive 36001 with test train at Oxted
Works diagram of the Leader
Works diagram of the Leader
The Leader boiler and firebox, showing the offset firehole door position (dotted). Also visible are two of the four thermic siphons.
The Leader boiler and firebox, showing the offset firehole door position (dotted). Also visible are two of the four thermic siphons.
The Leader being lifted onto its power bogies at Brighton, May 1949. The casing allowed the locomotive to be put through a carriage-washing plant.
The Leader being lifted onto its power bogies at Brighton, May 1949. The casing allowed the locomotive to be put through a carriage-washing plant.