Line 11 of the Shenzhen Metro opened on 28 June 2016. Line 11 has a length of 53.5 km and a total of 19 stations. It connects the CBDs of Futian, Nanshan and Qianhai to Shenzhen Bao'an International A
A CRRC Zhuzhou Electric Locomotive Works train
CRRC Zhuzhou Electric Locomotive Works train interior
A Changchun Railway Vehicles train
Line 6, also known as the Guangming line of the Shenzhen Metro is in operation. Line 6 is part of the Phase III expansion of the Shenzhen Metro with a construction time frame scheduled for 2015–2019.
Guangming station
The unused spur line junction just south of Changzhen station.