advertisement
Infinite photos and videos for every Wiki article · Find something interesting to watch in seconds
History
Page
CRRC Puzhen rakes of the Mumbai Metro Line 1
CRRC Puzhen rakes of the Mumbai Metro Line 1
Azad Nagar station under construction in Andheri in March 2012
Azad Nagar station under construction in Andheri in March 2012
A metro train arriving at the D.N. Nagar station during the trial run in May 2013
A metro train arriving at the D.N. Nagar station during the trial run in May 2013
Ajmera Marol Naka station under construction in Andheri in 2012
Ajmera Marol Naka station under construction in Andheri in 2012
Page
BEML Mumbai Metro rake at Gundavali Station on Line 7
BEML Mumbai Metro rake at Gundavali Station on Line 7
CRRC Puzhen trainset on Line 1 approaching Andheri station in 2019
CRRC Puzhen trainset on Line 1 approaching Andheri station in 2019
A metro station under construction in Andheri in March 2012
A metro station under construction in Andheri in March 2012
Metro passes were included with the Mumbai 1 card introduced in 2021
Metro passes were included with the Mumbai 1 card introduced in 2021