Main Street Tunnel
…was constructed at the same time as the channel above it and a simple cut and cover. The tunnel was officially opened on May 20, 1972. The tunnel links Highway 406 on the west side of the canal, which travels north to St. Catharines to Highway 140 on the east side, which travels south to Port Colborne. Niagara…