The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Majerhat metro station composite structure (station on viaduct and two concourse buildings on either sides) as seen from Majerhat railway station's fo
Majerhat metro station composite structure (station on viaduct and two concourse buildings on either sides) as seen from Majerhat railway station's foot over bridge
Majerhat metro station signboard
Majerhat metro station signboard
Majerhat metro station second concourse building
Majerhat metro station second concourse building
Majerhat metro station first concourse building
Majerhat metro station first concourse building
Top: An ICF MEDHA rake arriving at Hemanta Mukhopadhyay station of the Orange Line. Bottom: A BEML rake departing from Mahakaran station of the Green
Top: An ICF MEDHA rake arriving at Hemanta Mukhopadhyay station of the Orange Line. Bottom: A BEML rake departing from Mahakaran station of the Green Line.
ICF MEDHA MR 416
ICF MEDHA MR 416
Shyambazar-Belgachhia Section (shield tunneling using compressed air and airlocks) using Hungarian expertise during its construction in the 1980s
Shyambazar-Belgachhia Section (shield tunneling using compressed air and airlocks) using Hungarian expertise during its construction in the 1980s
Hooghly River Underwater metro tunnel segment
Hooghly River Underwater metro tunnel segment