A plan for a cut-and-cover tunnel was replaced with a deeper mined tunnel in order to avoid disruptions to Swanston Street, Melbourne's main civic spi
A plan for a cut-and-cover tunnel was replaced with a deeper mined tunnel in order to avoid disruptions to Swanston Street, Melbourne's main civic spine and busiest tram corridor.
Melbourne's City Square, which has been demolished for construction of Town Hall station
Melbourne's City Square, which has been demolished for construction of Town Hall station
Acoustic shed at Anzac station in the domain precinct. Acoustic sheds were installed at Metro Tunnel station precincts to reduce noise and dust.
Acoustic shed at Anzac station in the domain precinct. Acoustic sheds were installed at Metro Tunnel station precincts to reduce noise and dust.
Parkville Station construction progress at the University of Melbourne in February 2018, showing the excavation of Grattan St for the station box
Parkville Station construction progress at the University of Melbourne in February 2018, showing the excavation of Grattan St for the station box
The Sunshine route would run next to the Albion Viaduct, requiring a second rail bridge next to the existing trestle rail bridge over the Maribyrnong
The Sunshine route would run next to the Albion Viaduct, requiring a second rail bridge next to the existing trestle rail bridge over the Maribyrnong River.
These electricity transmission towers were planned to be relocated to allow elevated rail over the M80 Ring Road (left).
These electricity transmission towers were planned to be relocated to allow elevated rail over the M80 Ring Road (left).
Aerial view of Melbourne Airport. The design of the terminating station at the airport was the subject of extended dispute.
Aerial view of Melbourne Airport. The design of the terminating station at the airport was the subject of extended dispute.
The airport line will use High Capacity Metro Trains, introduced as part of the Metro Tunnel project.
The airport line will use High Capacity Metro Trains, introduced as part of the Metro Tunnel project.