The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
A train at Lafarge Lake–Douglas station
A train at Lafarge Lake–Douglas station
Commercial Drive station under construction in September 2001
Commercial Drive station under construction in September 2001
Staging pit for the tunnel boring machine at the site of Great Northern Way–Emily Carr station in April 2022
Staging pit for the tunnel boring machine at the site of Great Northern Way–Emily Carr station in April 2022
"Traffic decks" were built atop station construction sites to avoid road closures.
"Traffic decks" were built atop station construction sites to avoid road closures.
An Expo Line train in New Westminster
An Expo Line train in New Westminster
Operations and Maintenance Centre 1, located east of Edmonds station in Burnaby
Operations and Maintenance Centre 1, located east of Edmonds station in Burnaby
Crossover west of King George station
Crossover west of King George station
King George station has been an Expo Line terminus since 1994 and is the starting point of the Surrey–Langley extension.
King George station has been an Expo Line terminus since 1994 and is the starting point of the Surrey–Langley extension.