Infinite photos and videos for every Wiki article · Find something interesting to watch in seconds
History
Page
Montague Street Bridge in November 2017
Montague Street Bridge in November 2017
Over-height detection gantry
Over-height detection gantry
Page
The Melbourne end of the line (near the centre) stopped at the City Terminus on Flinders street, at the end of Queen Street
The Melbourne end of the line (near the centre) stopped at the City Terminus on Flinders street, at the end of Queen Street
The line, inaugurated on 12 September 1854, was the first in Australia to be steam-powered. A train is pictured here arriving at the company's City Te
The line, inaugurated on 12 September 1854, was the first in Australia to be steam-powered. A train is pictured here arriving at the company's City Terminus at Flinders Street.
D-class Melbourne tram on route 109 at Port Melbourne. The former railway station building housed a medical centre and restaurant.
D-class Melbourne tram on route 109 at Port Melbourne. The former railway station building housed a medical centre and restaurant.
Looking towards Port Melbourne from the Swallow Street level crossing, the railway signals have been removed and have been replaced with signals resem
Looking towards Port Melbourne from the Swallow Street level crossing, the railway signals have been removed and have been replaced with signals resembling traffic signals for the trams