The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The exterior of the Multi-Payload Processing Facility
The exterior of the Multi-Payload Processing Facility
The ORFEUS-SPAS-2 satellite is prepared in the MPPF for STS-80, which launched in November 1996
The ORFEUS-SPAS-2 satellite is prepared in the MPPF for STS-80, which launched in November 1996
The Wake Shield Facility-3 (WSF-3) is lowered into the payload canister for STS-80 in the MPPF
The Wake Shield Facility-3 (WSF-3) is lowered into the payload canister for STS-80 in the MPPF
A payload for STS-107 awaiting transfer to the payload canister
A payload for STS-107 awaiting transfer to the payload canister
The SLS rocket for Artemis II atop ML-1 at Launch Complex 39B in January 2026
The SLS rocket for Artemis II atop ML-1 at Launch Complex 39B in January 2026
Comparison between ML-1 and planned ML-2
Comparison between ML-1 and planned ML-2
ML-2 under construction in January 2026
ML-2 under construction in January 2026