NextEra Energy Resources, LLC (NEER) is a wholesale electricity supplier based in Juno Beach, Florida. NEER is a subsidiary of NextEra Energy, a Fortune 200 company. Prior to 2009, NextEra Energy Resources was known as FPL Energy.
Hancock County Wind Energy Center in Hancock County, Iowa, with 148 Vestas V47-660 kW wind turbines for a total nameplate capacity of 97.68 MW. Half of the wind turbines are southwest of Klemme and the other half are south-southeast of Duncan. NextEra Energy owns the wind farm, which began operating in 2002
Desert Sunlight Solar Farm
The Desert Sunlight Solar Farm is a 550-megawatt (MWAC) photovoltaic power station approximately six miles north of Desert Center, California, United States, in the Mojave Desert. It uses approximately 8.8 million cadmium telluride modules made by the US thin-film manufacturer First Solar. It has the same 550 MW installed capacity as the Topaz Solar Farm in the Carrizo Plain region of Central California, making both of them tied for the second largest completed solar plants by installed capacity as of fall 2015.
Solar arrays at Desert Sunlight
The battery storage station was completed in 2022