Nihonbashi River
…in depth and subject to a tidal range of up to two meters. The river banks are heavily built up in character and the Inner Circular Route C1 of the Shuto Expressway has covered almost the entire length of the river since the expressway's construction in 1962. Despite this the river features urban park space along…