B-25 Mitchell bomber production line at the North American Aviation plant, Inglewood, California, October 1942. The plane's outer wings have yet to be added, which enables the two side-by-side assembly lines to be closer together. The outer wings will be attached outdoors, in the "sunshine" assembly line.