The Pakoka River in flood with sediment loading
The Pakoka River in flood with sediment loading
The river rises at Te Uku Wind Farm.
The river rises at Te Uku Wind Farm.
After two kilometres in the pine forest the river is wide enough to be bridged.
After two kilometres in the pine forest the river is wide enough to be bridged.
The area between the pine forest and Bridal Veil, alongside Pipiwharauroa Way, has now been fenced and planted.
The area between the pine forest and Bridal Veil, alongside Pipiwharauroa Way, has now been fenced and planted.
The wind farm in June 2012
The wind farm in June 2012
A 10.9 tonne 49m long Siemens turbine blade waits at the summit of SH23 for its scheduled time to close the road in November 2010.
A 10.9 tonne 49m long Siemens turbine blade waits at the summit of SH23 for its scheduled time to close the road in November 2010.
A 54 tonne 27m long Korean built tower segment descends SH23 on its journey from Ports of Auckland in November 2010.
A 54 tonne 27m long Korean built tower segment descends SH23 on its journey from Ports of Auckland in November 2010.
The part-formed cutting through Okete Volcanics rock has been widened twice since 2003.
The part-formed cutting through Okete Volcanics rock has been widened twice since 2003.