Pimlico District Heating Undertaking
…per year. Based on the operational success of the Pimlico undertaking several schemes were proposed, and one was partly built, using waste heat from Bankside power station. However, none were economically viable. As of 2024 the pipework in the system is beyond its design life. Repairs to the leaking system are disruptive…