The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Station entrance, northern side
Station entrance, northern side
Train arrives on a Hainault-bound service
Train arrives on a Hainault-bound service
A 1992 stock Central line train leaving Theydon Bois
A 1992 stock Central line train leaving Theydon Bois
Harry Bell Measures designed the surface buildings for the CLR, such as this one at Oxford Circus.
Harry Bell Measures designed the surface buildings for the CLR, such as this one at Oxford Circus.
Loughton station was rebuilt in the 1930s, with a central track accessed by two platforms for the Central line extension. Opening in 1940, it was not
Loughton station was rebuilt in the 1930s, with a central track accessed by two platforms for the Central line extension. Opening in 1940, it was not served by Central line trains until 1948. Today, the station is a listed building.
Standard Stock behind a steam autotrain service at Epping in 1957
Standard Stock behind a steam autotrain service at Epping in 1957