Rough is a natural gas storage facility under the North Sea off the east coast of England. It is capable of storing 100 billion cubic feet of gas, nearly double the storage capacities in operation in Great Britain in 2021.
Easington gas terminal. From here the gas flow in and out of the Rough field is managed.
The Easington Gas Terminal is one of six main gas terminals in the UK, and is situated on the North Sea coast at Easington, East Riding of Yorkshire and Dimlington. The other main gas terminals are at St Fergus, Aberdeenshire; Bacton, Norfolk; Teesside; Theddlethorpe, Lincolnshire and Rampside gas terminal, Barrow, Cumbria. The whole site consists of four plants: two run by Perenco, one by Centrica and one by Gassco. The Easington Gas Terminals are protected by Ministry of Defence Police officers and are provided with resources by the Centre for the Protection of National Infrastructure.
Easington and Dimlington gas terminals
The Langeled pipeline collects gas - around 20% of the UK's needs - from the Nyhamna Gas Plant, and the Ormen Lange gas field; from 2006-11, the Langeled pipeline was the longest undersea pipeline in the world
View from the north in November 2008
Gas pipeline being built in North Yorkshire in June 2006, for connection to Easington