Infinite photos and videos for every Wiki article · Find something interesting to watch in seconds
History
Page
While heavy road traffic on the surface, train tunnel is building underneath at Causeway Bay section
While heavy road traffic on the surface, train tunnel is building underneath at Causeway Bay section
Expansion of City One platform with new platform gates, allowing 8-coach trains to stop
Expansion of City One platform with new platform gates, allowing 8-coach trains to stop
All existing SP1900 EMU trains were transferred to and now operated on the East West Corridor
All existing SP1900 EMU trains were transferred to and now operated on the East West Corridor
The R-train will operate on the North South Corridor.
The R-train will operate on the North South Corridor.
Page
An MTR train on the Tung Chung line
An MTR train on the Tung Chung line
An Airport Express train
An Airport Express train
The Tseung Kwan O line was opened in 2002 to serve new housing developments. Pictured is Po Lam station, the northern terminus of the line.
The Tseung Kwan O line was opened in 2002 to serve new housing developments. Pictured is Po Lam station, the northern terminus of the line.
A Disneyland Resort line train at Disneyland Resort station
A Disneyland Resort line train at Disneyland Resort station