Sir Adam Beck Hydroelectric Generating Stations are two hydroelectric generating stations in Niagara Falls, Ontario, Canada. Sir Adam Beck Generating Station I, Sir Adam Beck Generating Station II and
The Adam Beck stations as seen from the air; the northern dam (nearest) is Adam Beck I and the southern is Adam Beck II.
The Chippawa-Queenston Power Canal in 1921; it was the first of three sources to provide water to the Generating Stations
The Adam Beck dams are at the left, and the Robert Moses Station is on the right of the image
The Rankine Generating Station is a former hydro-electric generating station along the Canadian side of the Niagara River in Niagara Falls, Ontario, slightly downstream from the older Toronto Power Ge
The station building in August 2025
Interior of the station building in 2023