Infinite photos and videos for every Wiki article · Find something interesting to watch in seconds
Infinite photos and videos for every Wiki article · Find something interesting to watch in seconds
Dam construction as of April 2017
Dam construction as of April 2017
Portion of the 80-kilometre stretch of valley planned for flooding
Portion of the 80-kilometre stretch of valley planned for flooding
Site C Dam construction site near Fort St. John. Clearing on far side of river is part of the construction zone.
Site C Dam construction site near Fort St. John. Clearing on far side of river is part of the construction zone.
BC Hydro
In 1957 BC Electric Company moved from its Carrall Street headquarters to a modern 21 storey building on Burrard Street. In 1998, it was converted to
A 1954 Brill trolley bus that has been preserved in a paint scheme adopted by BC Hydro in 1962. Note Hydro logo on front.
A 1954 Brill trolley bus that has been preserved in a paint scheme adopted by BC Hydro in 1962. Note Hydro logo on front.
Revelstoke Dam on Columbia River, BC
Revelstoke Dam on Columbia River, BC
The Hugh Keenleyside Dam (left) was completed in 1968. The Arrow Lakes Generating Station (right) was added in 2002.
The Hugh Keenleyside Dam (left) was completed in 1968. The Arrow Lakes Generating Station (right) was added in 2002.