Snubbing is a type of heavy well intervention performed on oil and gas wells. It involves running the BHA on a pipe string using a hydraulic workover rig. Unlike wireline or coiled tubing, the pipe is
225k Snubbing Unit
340k units are designed to perform live and dead well interventions on both land and offshore.
Special build containerized stand alone 600K unit in the jungle.
A well intervention, or well work, is any operation carried out on an oil or gas well during, or at the end of, its productive life that alters the state of the well or well geometry, provides well di