Stadium MRT station is an underground Mass Rapid Transit (MRT) station on the Circle Line (CCL). Located in the area of Kallang, Central Region, Singapore, the station serves the Singapore Sports Hub and its facilities including the National Stadium, Indoor Stadium, Kallang Theatre and Leisure Park Kallang. It is operated by SMRT Trains.
Exit A of the station
Construction works for the station in 2006
A train from Marina Bay station terminating at the station
The curved side contrasting against the straight side of the station
Mass Rapid Transit (Singapore)
The Mass Rapid Transit system, locally known by the initialism MRT, is a rapid transit system in Singapore and the island country's principal mode of railway transportation. The system commenced operations in November 1987 after two decades of planning with an initial 6 km (3.7 mi) stretch consisting of five stations. The network has since grown to span the length and breadth of the country's main island – with the exception of the forested core and the rural northwestern region – in accordance with Singapore's aim of developing a comprehensive rail network as the backbone of the country's public transportation system, averaging a daily ridership of 3.4 million in 2019.
Image: NS19 Toa Payoh MRT Exit D 20220712 192031 (cropped 16 to 9)
Image: NE7 Little India MRT Exit E 20210904 131526
Image: Jurong East MRT station 230622
Image: CG1 Expo EWL MRT Platforms