The Subaru R1e was a battery-electric microcar produced by Fuji Heavy Industries (FHI), first shown at the 2003 Tokyo Motor Show. The concept was jointly developed to prototype form with Tokyo Electric Power (TEPCO), the giant Japanese utility company. At least 40 prototypes were built by FHI and tested by TEPCO and the New York Power Authority. The vehicle had a range of 80 kilometres (50 mi) and a top speed of 100 km/h (62 mph).
Subaru R1e
R1e underhood detail
Tokyo Electric Power Company
Tokyo Electric Power Company Holdings, Incorporated is a Japanese electric utility holding company servicing Japan's Kantō region, Yamanashi Prefecture, and the eastern portion of Shizuoka Prefecture. This area includes Tokyo. Its headquarters are located in Uchisaiwaicho, Chiyoda, Tokyo, and international branch offices exist in Washington, D.C., and London. It is a founding member of strategic consortiums related to energy innovation and research; such as JINED, INCJ and MAI.
Headquarters in Chiyoda, Tokyo
Three of the reactors at Fukushima I overheated, causing meltdowns that eventually led to explosions, which released large amounts of radioactive material into the air.
Spent nuclear fuel pool at TEPCO's Fukushima Daiichi Nuclear Power Plant on 27 November 2013