The Swift Green Line is a bus rapid transit route in Snohomish County, Washington, United States, part of the Swift network operated by Community Transit. It was opened in 2019 and travels 12.5 miles (20.1 km) along Airport Way and State Route 527, connecting 32 stations in the cities of Everett, Mill Creek, and Bothell. Its termini are at Seaway Transit Center, adjacent to the Boeing factory, and Canyon Park Park and Ride on Interstate 405; the Green Line also intersects the Blue Line in Everett and also serves Paine Field.
A southbound Green Line bus at 3rd Avenue SE
The northbound station at 196th Street Southeast
Swift Bus Rapid Transit is a bus rapid transit system operated by Community Transit in Snohomish County, Washington, part of the Seattle metropolitan area. Swift consists of three routes that total over 40 miles (64 km) in length. The Blue Line, opened in 2009, runs on the State Route 99 corridor between Everett and Shoreline. The Green Line opened in 2019 and runs from the Boeing Everett Factory to Mill Creek and Bothell via State Route 527. It was followed by the Orange Line, which connects Lynnwood to Mill Creek, in 2024.
A southbound Blue Line bus at Wetmore Avenue Station in downtown Everett
A Swift bus deadheading to Everett Station to begin its route
August 2009
April 2014