The Sydney–Perth rail corridor, also known as the East–west rail corridor, is a 1435 mm standard gauge railway route that runs for 4352 kilometres across Australia from Sydney, New South Wales, to Per
Leaving Kewdale Freight Terminal, Western Australia, is a typical freight train of the East–west rail corridor, with three locomotives totalling 9340 hp (10,490 kW) power output, a crew car, and a train of up to 1.8 km of container cars (many of them double-stacked)