The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
Exit A of Telok Ayer MRT station.
Exit A of Telok Ayer MRT station.
The temporary viaduct built during the station's construction in December 2010
The temporary viaduct built during the station's construction in December 2010
Platform B of the station
Platform B of the station
The station concourse level featuring the artwork
The station concourse level featuring the artwork
Exit A of Chinatown MRT station
Exit A of Chinatown MRT station
NEL platform level
NEL platform level
The Garden Bridge (pictured in 2018) was underpinned during the construction.
The Garden Bridge (pictured in 2018) was underpinned during the construction.
DTL construction site in December 2010
DTL construction site in December 2010