Thames and Medway Canal
…57,433. From the Gravesend basin, the canal began with a straight section aligned with New Tavern Fort, Gravesend. By 1801 it ran 4 miles (6.4 km) to Higham. A new engineer, Ralph Walker, arrived and announced that the whole canal would cost significantly more than the revised estimate. Work halted, and by…