Totley Tunnel
…system, signal wires were installed which, when cut, caused alarms to ring in the signal boxes at each end. The same system was used in the shorter Cowburn and Clay Cross Tunnels. From the Hope Valley towards Totley the tunnel starts level, then falls on gradients of 1 in 150, 1 in 176, and 1 in 100…