Učka Tunnel
…tunnel tube, opened for traffic on the 13 September 2024 is 5,634 m (18,484 ft) long. It is the third longest in Croatia after the Mala Kapela and Sveti Rok tunnels. Construction on the original tunnel tube began in 1978, and at the time of opening it was the longest road tunnel in Yugoslavia. The toll is…