The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
The entire wiki reimagined as a visual magazine with video discovery · Watch your interests come alive
VL-SRSAM
VL-SRSAM being tested from vertical launch system by DRDO and Indian Navy.
VL-SRSAM being tested from vertical launch system by DRDO and Indian Navy.
Maiden test (22 February 2021).
Maiden test (22 February 2021).
VLS integrated operational validation test (7 December 2021).
VLS integrated operational validation test (7 December 2021).
First ship-borne test from an Indian naval ship (24 June 2022).
First ship-borne test from an Indian naval ship (24 June 2022).
Anant Shastra during its second flight test
Anant Shastra during its second flight test
Sub-system validation test (3 July 2017).
Sub-system validation test (3 July 2017).
Aerodynamics verification, high maneuverability demo, propulsion & structural performance at various elevations (26 February 2019).
Aerodynamics verification, high maneuverability demo, propulsion & structural performance at various elevations (26 February 2019).
Multiple threat engagement with live targets (4 August 2019).
Multiple threat engagement with live targets (4 August 2019).